11-2016 - Phase 2


10-2016 - Phase 2


10-2016 Building G


10-2016 Building H


10-2016 Building I


10-2016 Building K


10-2016 - Parking


06-2016 New swimming pool


06-2016 Building K


06-2016 Building E


06-2016 Building F


06-2016 Building G


06-2016 Building H


06-2016 Building I


06-2016 New garages


08-15 Fase 1 from the sky


08-2015 Building E


08-2015 Building G


08-2015 Building K


08-2015 Preparation building F


08-2015 Preparation building I


08-2015 Swimming pool of the phase 2


2015 Comun aeras: swimming pool and bar-restaurant The “Kalisté”


Solar Panels

Aligio apart-hotel is turning heads as the new solar panels are set to go on
line this week, more than 600m² /6,458 ft2 for the first phase of the
project. Maintaining the commitment to reduce our carbon footprint, keep the
oceans blue and lowering your condominium fees.


Delivered apartments


01 04 2015 Common part of the residence


01 04 2015 Building M


01 04 2015 Building L


04 01 2015 Bloc C


01 04 2015 Building D


01 04 2015 Bloc B


Building A Model suite

The Aligio model apartment is cozy, modern and elegant. Come to visit it!


10 27 2014 SPA Bar and Swimming pool


10 27 2014 Bloc B


10 27 2014 Bloc C


10 27 2014 Bloc D


10 27 2014 Bloc J


10 27 2014 Bloc L


10 27 2014 Bloc M


02 10 2014 Common area


02 10 2014 Building L


02 10 2014 SPA Bar and Swimming pool


08 20 2014 Bar and Swimming pool


08 20 2014 Building B


08 20 2014 Building L


07 2014 Building J


07 2014 Swimming pool


07 2014 Building M


07 2014 Bar


07 2014 Building L


07 2014 Building B


07 2014 Building C


05 25 2014 Spa Bar Pool


05 25 2014 Building C


05 25 2014 Building J


05 25 2014 Builiding L and M

Waterproofing of buildings has began, as well as the installation of the coralina; beautiful stone, in the floors and bathrooms


04 07 2014 Palazzo J


04 07 2014 Building L


04 07 2014 Building M


04 07 2014 Building B, C and Spa


03 04 2014 Building M


03 03 2014 Building L


12 13 2013 Bulding J

Starting up of the block J


12 13 2013 Building L

We arrive at the third level


12 13 2013 Bloc A


11 26 2013 Building M


11 26 2013 Building L

The construction of the building L keeps going up.


11 26 2013 Bloc A

The building A is almost ready. The model suit will be available soon.


10 18 2013 Building L


10 12 2013 Building L

The second level is going up! come and check out our construction or email us.


10 10 2013 Building L

Preparation of the second floor


10 01 2013 Building A

Preparation of roof terrace


10012013 Building L

Preparation of the second floor


09 13 2013 Building L

The walls are going up quickly


09 13 2013 Building M


09 13 2013 Building A

The building A, first line beachfront building, the construction progresses quickly, take advantage of our last two condos available on the first floor.


09 05 2013 Building M

Walls begin to rise


09 05 2013 Building L

Ground level Floor


08282013 Buiding M

Ground level Floor


08282013 Building L

building L


08 15 2013 Building M

Ground level floor is being prepared


08 10 2013 Building L

Foundation building L


08 08 2013 Building M

foundation building M


July 2013

Building M and A


Inauguration of the beginning of the construction


03 04 2014 Building J